Shop Update: 1/2/10
January 2nd, 2010 Posted in NewsThe number of members who came out was low because of the holidays.
Rick and Nigel continued their work on the Shay. The Shay is being readied for Lenny, a certified boiler welder, to come out and tack in the patch for the front tube sheet. Once this has been done, the plan is to rivet the patch to the boiler before Lenny permanently welds it into place. To do the riveting, a brace for bucking has already been installed.
Bill and Ralph continued the work on machining parts for the 1630.
Sorry, comments for this entry are closed at this time.